offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Race Bank Offshore Wind Farm Goes Full Throttle
Grid Connection

February 1, 2018 · about 8 years ago

Race Bank Offshore Wind Farm Goes Full Throttle

Full power output has been achieved at Ørsted’s Race Bank offshore wind farm located off the North Norfolk coast, UK.

1 minutes read
  • LinkedIn
  • X
  • Email

Full power output has been achieved at Ørsted’s Race Bank offshore wind farm located off the North Norfolk coast in the UK.

Installation of the final wind turbine at Race Bank was completed in December 2017, and following successful completion of the 240-hour acceptance tests of all 91 turbines, and the 200-hour test of the full wind farm, the project is now capable of generating its full capacity of 573MW.

During the commissioning process of the final turbines, Race Bank also passed 1TWh of production since construction began.

One wind turbine generator was installed in just over 11 hours – a record for the company. The whole commissioning process has exceeded expectations, Ørsted said.

Race Bank uses Siemens Gamesa 6MW wind turbines and many of these turbines feature the first blades to be manufactured at the Siemens Gamesa blade factory in Hull.

Race Bank will be Ørsted’s first offshore wind farm to use a new Service Operation Vessel (SOV) for operations and maintenance (O&M). The SOV can remain out at sea with the O&M team for up to 28 days at a time, and will greatly improve the efficiency of maintaining the project, the company said.

A team based in Grimsby will be responsible for carrying out this O&M work for the lifetime of Race Bank.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago