offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Jan De Nul to Install Trianel Borkum II Turbines
Business & Finance

February 14, 2018 · about 8 years ago

Jan De Nul to Install Trianel Borkum II Turbines

Jan De Nul has won a contract by Senvion for the installation of wind turbine generators (WTG) at the 203MW Trianel Borkum II (TWB II) offshore wind farm in Germany.

1 minutes read
  • LinkedIn
  • X
  • Email

Jan De Nul has won a contract by Senvion for the installation of wind turbines at the 203MW Trianel Borkum II (TWB II) offshore wind farm in Germany.

Under the contract, Jan De Nul will be in charge of installing 32 Senvion 6.33MW turbines, as well as providing offshore mechanical completion works.

The turbine installation works at the site some 40km north of the island of Borkum, within the German Bight sector, are planned to start in the spring of 2019.

Jan De Nul is also in charge, under a separate contract, of installing the HVAC export cable for the TWB II project.

The TWB II wind farm will be constructed throughout this year and is scheduled for commissioning by the end of 2019.

The wind farm is the second phase of the Trianel Windpark Borkum offshore wind farm, which has been operational since 2015.

Shareholders of TWB II are EWE AG (37.5%), ewz Offshore Borkum GmbH (24.51%) and 17 German municipal utilities together with Trianel GmbH (37.99%).

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceContracts & TendersOperations & MaintenanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

14 days ago