offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›RollDock On Merkur Run
Operations & Maintenance

February 15, 2018 · about 8 years ago

RollDock On Merkur Run

RollDock is currently transporting the transition pieces (TPs) for the Merkur offshore wind farm from Aviles, Spain, to the Buss Orange Blue Terminal in the Eemshaven port, the Netherlands.

1 minutes read
  • LinkedIn
  • X
  • Email

RollDock is currently transporting the transition pieces (TPs) for the Merkur offshore wind farm from Aviles, Spain, to the Buss Orange Blue Terminal in the Eemshaven port, the Netherlands.

The company’s vessel RollDock Sea has already transported 34 out of 66 TPs in five shipments, with four more shipments left.

According to RollDock, the project is a major challenge as the components have caused the cargo weight, the lifting capacity of one crane and the available dock to be used to the maximum.

The TPs, produced by the Idesa-Windar joint venture, are being transported in a verticalized manner due to a weight of 330 metric tons and a height of 27.9 meters.

A2Sea’s jack-up vessel Sea Challenger began installing the structures at the site 45km north of the German island of Borkum in November last year.

The 396MW Merkur offshore wind farm will consist of 66 GE Haliade 150-6MW wind turbines and is scheduled to be fully operational in 2019.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenancePorts & LogisticsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

12 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

12 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago