offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Bredenoord Powering Wikinger until Full Commissioning
News

February 19, 2018 · about 8 years ago

Bredenoord Powering Wikinger until Full Commissioning

Bredenoord has supplied 72 generators for the Wikinger offshore wind farm in Germany until the 350MW project is fully commissioned and starts feeding power into the national grid.

1 minutes read
  • LinkedIn
  • X
  • Email

Bredenoord has supplied 72 generators for the Wikinger offshore wind farm in Germany until the 350MW project is fully commissioned and starts feeding power into the national grid.

The Netherlands-based company informed today (19 February) that it had provided 72 generators with a power of 70kVA and 72 IBC fuel tanks with a capacity of 1,300 litres, so the wind turbines could be regularly turned on, protected against corrosion and that necessary functions such as lighting were maintained.

Although the wind turbines are now supplied with power from the mainland, the Bredenoord generators are still in use as emergency backup generators, according to the company.

To ensure Adwen can monitor the generators remotely and during operation, the power supply systems were equipped with remote monitoring, Bredenoord said.

The Wikinger offshore wind farm, developed by Spanish Iberdrola, comprises 70 Adwen 5MW wind turbines, the last of which was installed on 22 October 2017. The project was linked to the national grid at the end of December 2017. Commissioning works at the site off the north-eastern coast of the island of Rügen are still underway.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago
Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago