offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›TÜV Rheinland on Trianel Windpark Borkum II Blade Watch
Contracts & Tenders

February 28, 2018 · about 8 years ago

TÜV Rheinland on Trianel Windpark Borkum II Blade Watch

Senvion has contracted TÜV Rheinland to oversee the production of wind turbine blades for the Trianel Windpark Borkum II offshore wind farm.

1 minutes read
  • LinkedIn
  • X
  • Email

Senvion has contracted TÜV Rheinland to oversee the production of wind turbine blades for the Trianel Windpark Borkum II offshore wind farm.

In the process, TÜV Rheinland will check that the blades, to be built in Portugal, conform to the production documents, that the rules of technology are observed, that specific quality requirements set down in the specifications are met, and that deadlines are observed. TÜV Rheinland will also examine the documentation.

The Trianel Windpark Borkum II wind farm is being developed 45 kilometers to the north of Borkum in the German North Sea as the second stage of the Trianel Windpark Borkum, a wind farm that has been operating since 2015.

The wind farm’s 32 Senvion 6.2M152 turbines are expected to be connected to the grid in 2019. After the planned completion scheduled for autumn 2019, the offshore wind farm will have an installed capacity of approximately 203MW.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

16 days ago