offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›R&D›ORE Catapult Welcomes Longest Blade at Blyth
R&D

March 2, 2018 · about 8 years ago

ORE Catapult Welcomes Longest Blade at Blyth

One of the world’s longest offshore wind turbine blades has arrived at the Offshore Renewable Energy Catapult’s testing facilities in Blyth, Northumberland.

1 minutes read
  • LinkedIn
  • X
  • Email

One of the world’s longest offshore wind turbine blades has arrived at the Offshore Renewable Energy Catapult’s testing facilities in Blyth, Northumberland.

The 88.4-metre LM Wind Power blade, the longest blade to date to arrive at Blyth to be tested, will be put through its paces at ORE Catapult’s 100m blade-test facility over the coming months.

The blade has been developed as part of XL-Blade, an EU Demowind-funded project.

Started in January 2016 and ending in June 2019, the XL Blade project aims to reduce the overall cost of offshore wind energy by designing, validating and deploying the world’s largest offshore wind turbine blade.

Specific technological objectives are design, manufacturing and in-field validation of a blade approaching 90m in length with aggressive weight targets.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

R&DTechnology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less
Industry

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

22 days ago

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

23 days ago

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

23 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less
Industry

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

22 days ago
Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

23 days ago
New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

23 days ago