offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Mammoet Cuts Nissum Bredning Costs by Avoiding Dredging
Wind Farm Update

March 16, 2018 · about 8 years ago

Mammoet Cuts Nissum Bredning Costs by Avoiding Dredging

Mammoet today (16 March) released details about the installation of four offshore wind turbines at Nissum Bredning, saying the turbines had been erected efficiently and cost-effectively by excluding dredging, which would have been imperative at this shallow-water site if a conventional approach had

2 minutes read
  • LinkedIn
  • X
  • Email

Mammoet today (16 March) released details about the installation of four offshore wind turbines at Nissum Bredning, saying the turbines had been erected efficiently and cost-effectively by excluding dredging, which would have been imperative at this shallow-water site if a conventional approach had been employed.

Given the seabed conditions and shallow water depths of around three meters, Nissum Bredning cannot be accessed by installation vessels typically used at offshore wind projects without prior dredging.

Mammoet proposed a barge with an integrated ballasting system which allowed it to be lowered and grounded onto the seabed. This provided the necessary stability for the operation while eliminating the need for dredging. The solution effectively resembled an onshore installation and also simplified matters, as now the lift could be performed with a LR11350 crane, a land-based crane which among others is used for onshore wind power projects. Mammoet’s approach overcame the challenging near shore environment to safely install all four wind turbines. By excluding dredging from the process, the method saved time, costs and resources.”

The wind turbines are mounted onto gravity jacket foundations and grid-connected using a new cable and turbine concept with a 66kV voltage. The fourth and final Siemens Gamesa 7MW wind turbine was installed at the site in the Bay of Thyborøn in January, and the wind farm produced its first electricity on 17 February.

According to the latest post on Nissum Bredning project’s Facebook page, the Siemens team stated that they had never experienced so few errors during the commissioning of a new wind farm as with the four turbines at this new Danish nearshore wind farm.

The 28MW offshore wind farm, which is a testbed for Siemens’ technology, will get support by receiving a guaranteed feed-in tariff of DKK 0.7/kWh (EUR 0.09/kWh) for the initial 10 years for the first 50,000 full load hours of operation.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

21 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

23 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

21 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

23 days ago