offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›MHI Vestas Sets Up Borkum Riffgrund 2 Base in Emden
Operations & Maintenance

March 16, 2018 · about 8 years ago

MHI Vestas Sets Up Borkum Riffgrund 2 Base in Emden

EMS Maritime Offshore GmbH (EMO) will from March 2018 onward provide MHI Vestas Offshore Wind with port facilities and logistics services in Emden for the Borkum Riffgrund 2 offshore wind farm.

2 minutes read
  • LinkedIn
  • X
  • Email

EMS Maritime Offshore GmbH (EMO) will from March 2018 onward provide MHI Vestas Offshore Wind with port facilities and logistics services in Emden for the Borkum Riffgrund 2 offshore wind farm.

After the installation of the 56 V164-8 MW wind turbines, MHI Vestas will commission the wind turbine generators and use the service base at Port Knock at the river Ems.

The service base will be used for the commissioning works on Borkum Riffgrund 2 for approximately one year. As the operator of the terminal facilities and the surrounding area, EMO will provide logistics services consisting of loading, warehousing, terminal logistics and berth management.

Stephan Kremers , Commissioning Project Manager of MHI Vestas Offshore, said: “EMO convinced us with their flexibility and availability of Locations around the river Ems delta, but in particular with the high independence of the location, 1st class services 24/7, as well as the versatility of Port Knock. We are looking forward to the cooperation with our new business partners. “

The recently modernized Port Knock is a pier of the AG “EMS” with a connected industrial area, which is located in front of the Emden harbor in the industrial area Rysumer Nacken. The area offers a high potential for development, which will be used extensively for the first time for an offshore wind project, EMO said.

Located 54km off the coast of Lower Saxony in Germany, next to Borkum Riffgrund 1, the 450MW Borkum Riffgrund 2 is scheduled for commissioning in 2019.

The wind farm’s wind turbines will be installed on 20 suction bucket jacket foundations and 36 monopile foundations .

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenancePorts & LogisticsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

12 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

12 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago