offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Authorities›Vattenfall Wins Dutch Zero Subsidy Offshore Wind Tender
Authorities

March 19, 2018 · about 8 years ago

Vattenfall Wins Dutch Zero Subsidy Offshore Wind Tender

The Dutch Ministry of Economic Affairs and Climate Policy has selected Vattenfall as the winning bidder in the country’s first non-subsidized offshore wind tender – the 700MW to 750MW Hollandse Kust Zuid I & II.

2 minutes read
  • LinkedIn
  • X
  • Email

The Dutch Ministry of Economic Affairs and Climate Policy has selected Vattenfall as the winning bidder in the country’s first non-subsidized offshore wind tender – the 700MW to 750MW Hollandse Kust Zuid I & II.

The Netherlands opened the first phase of the tender for sites I and II in the Hollandse Kust Zuid offshore wind zone on 15 December 2017. The zero subsidy tender round attracted major offshore wind players such as Vattenfall and Statoil .

The grid connection was not part of the scope of the application and will be provided by the Dutch grid operator TenneT.

“This is excellent news for Vattenfall and the Netherlands. It is a significant step for us in view of our ambitions to grow in renewable energy production. We have previously announced that we intend to invest SEK 13 billion (EUR 1.5 billion) in growth investments in wind power for the period 2017-2018. The Netherlands is an important market for us and this will be our second offshore project there. It’s a great honor for us to get the opportunity to contribute with this project to the transformation of the Dutch energy system”, said Magnus Hall , Vattenfall’s President and CEO.

According to the tender rules, the wind farm needs to be fully operational within 5 years after an irrevocable permit. Vattenfall will now make the final preparations for this project including the design of the wind farm, continuation of the internal planning and finalizing the tender process for major components.

“Winning the bid for Hollandse Kust Zuid is a result of our continuous cost reduction efforts along our entire value chain and the solid track record and portfolio approach of our company. We are very happy to enlarge our contribution in making the Dutch energy system more sustainable and support our customers, large and small, on their way to become climate smarter,” said Gunnar Groebler , Vattenfall’s Senior Vice President Business Area Wind.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

AuthoritiesBusiness & FinanceContracts & TendersWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago