offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Adwen Turbine Missing Hardware on Alpha Ventus
Operations & Maintenance

April 9, 2018 · about 8 years ago

Adwen Turbine Missing Hardware on Alpha Ventus

A rear part of a nacelle panel on one of the Adwen M5000 (AD 5-116) wind turbines installed on the Alpha Ventus wind farm in the German North Sea has broken off and fell into the sea, the operator of the wind farm reports.

1 minutes read
  • LinkedIn
  • X
  • Email

A rear part of a nacelle panel on one of the Adwen M5000 (AD 5-116) wind turbines installed on the Alpha Ventus wind farm in the German North Sea has broken off and fell into the sea, the operator of the wind farm reports.

The accident happened on Friday, 06 April, the operator said. The reason for the accident is unknown, and representatives from Adwen are on site to determine the cause.

No one was injured and the debris poses no threat to the environment, according to the operator who notified the operators of the surrounding wind farms about the possibility of finding broken parts on wind farms and in the shipping lanes.

Several vessels have since participated in recovering of the debris, and the regional traffic centre has issued a warning to mariners.

The 60MW Alpha Ventus wind farm comprises six Adwen M5000 wind turbines and six Senvion 5M turbines. The remaining five Adwen M5000 turbines are currently in the idling mode, the operator said.

Alpha Ventus was commissioned as the first German offshore wind farm in April 2010. The wind farm is operated by Deutsche Offshore-Testfeld und Infrastructur GmbH & Co. KG (DOTI), a joint venture between EWE, E.ON and Vattenfall, and it serves as a test-bed for innovative technology.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago