offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Ørsted Charts Hornsea Two Course for Latest SOV
Operations & Maintenance

April 16, 2018 · about 8 years ago

Ørsted Charts Hornsea Two Course for Latest SOV

Louis Dreyfus Armateurs’ (LDA) new service operations vessel (SOV) will service Ørsted’s Hornsea Project Two offshore wind farm once delivered in 2021.

2 minutes read
  • LinkedIn
  • X
  • Email

Louis Dreyfus Armateurs’ (LDA) new service operations vessel (SOV) will service Ørsted’s Hornsea Project Two offshore wind farm once delivered in 2021.

The vessel will be designed by Salt Ship Design and built at the Cemre Shipyard in Turkey.

This is LDA’s second order with Salt Ship Design, following the one from February 2017 for Wind of Change, an SOV destined for Ørsted’s German offshore wind farms Borkum Riffgrund 1 and 2 and Gode Wind 1 and 2.

“We’re delighted to have secured the delivery of this pioneering new vessel on highly competitive terms to help maintain Hornsea Project Two, which when built will be the largest offshore windfarm in the world. The hybrid DP2 propulsion system will lower carbon emissions for the operation and the vessel’s walk to work system, ” said Edouard Louis-Dreyfus , President of the Louis Dreyfus Armateurs Group.

According to LDA, the 84 meter-long vessel will be equipped by a highly innovative hybrid propulsion system using Diesel generators with variable speed, and direct current propulsion network (DC grid), as well as the assistance of batteries capable to back up any faulty diesel generator. The SOV will enable the technicians to transfer safely to the wind turbines with a specially designed daughter craft (Workboat) and a dynamic motion compensated gangway and a helideck.

The vessel is capable of accommodating up to 60 local technicians.

“The vessel is the third SOV chartered by Ørsted to operate long term from our multi million pound East Coast Hub operations facility currently being constructed in Grimsby,” said Duncan Clark , Program Director for Hornsea Projects One and Two.

Hornsea Project Two will be built 89km from the Yorkshire coast, UK, and will be operated from Ørsted’s new O&M hub in Grimsby, where construction is underway . Once operational in 2022, it will be the world’s biggest offshore wind farm.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceVesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago