offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›SafeWay in Overdrive at Borkum West
Operations & Maintenance

April 17, 2018 · about 8 years ago

SafeWay in Overdrive at Borkum West

SafeWay has reached record transfer speeds during its latest charter at the Borkum West offshore wind farm, performing over ten average daily cargo transfers and topping at 13 transfers in 12 hours. The transfers were performed using the tip hoist of the gangway, which acted as a 3D lift, SafeWay sa

2 minutes read
  • LinkedIn
  • X
  • Email

SafeWay has reached record transfer speeds during its latest charter at the Borkum West offshore wind farm, performing over ten average daily cargo transfers and topping at 13 transfers in 12 hours.

The transfers were performed using the tip hoist of the gangway, which acted as a 3D lift, SafeWay said, emphasizing that the shift from personnel to cargo transfer mode does not take up any time because of the newly designed load handling A-frame arrangement.

According to the company, the operations proved an impressive score in reducing costs where Safeway could reach positions at Borkum West, as well as at the Wikinger offshore wind farm, without any modifications to the gangway or pedestal, which is due to the standard ten-meter vertical height adjustment of the gangway.

In October 2017, the SafeWay motion compensated offshore access system of the Dutch Van Aalst Group was installed on Olympic Subsea’s 95-meter long vessel Olympic Intervention IV. The 28-meter long walk-to-work Seagull-type has safely transferred workers and their tools from the vessel to the Adwen offshore wind turbines without any significant downtime, Safeway said.

“Our gangway in combination with the ‘Olympic Intervention IV’ proved to reach new record speeds in transferring people and cargo. Last year Siemens gave us a challenging benchmark for this vessel/gangway combination; from sail away to turbine , DP positioning, deploy and transfer 6 people and 3 cargo loads, return in sailing position within 30 minutes,” Remko de Boer, General Manager at SafeWay, said. “This will contribute to the overall industry costs savings, lowering installation and maintenance costs of offshore windfarms.”

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago