offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›EOLINK Floating Prototype Goes Into Operation
Grid Connection

April 20, 2018 · about 8 years ago

EOLINK Floating Prototype Goes Into Operation

EOLINK anchored and connected its 1/10 scale 12MW floating wind turbine prototype to the French grid on 19 April.

1 minutes read
  • LinkedIn
  • X
  • Email

EOLINK anchored and connected its 1/10 scale 12MW floating wind turbine prototype to the French grid on 19 April.

Earlier this year, the Bretagne-based startup secured funds to install and test the floating wind turbine prototype by receiving EUR 1 million in the first round of funding from investors such as Angels Finistere, as well as private investors.

The exact test location has not been disclosed.

In October 2016, EOLINK performed tank testing of a 1:50 scale model of its floating wind turbine, which showed that the turbine can withstand very harsh sea states with low mooring lines tensions (Hs>12m) and that it always faces the wind, even in the worst case scenario: 90° misalignment between wind and waves.

The EOLINK design targets the biggest power/weight ratio in order to get the best-in-class Levelized Cost of Electricity (LCOE) and this is the first time such ratio between the swept area and the floater’s size is tested, the company said.

The concept involves a set of profiled arms instead of a conventional single tower. Having a turbine mounted on a single tower induces vibrations and bending moment at the base, and with floating application this tower is no longer mandatory, EOLINK said, adding that its concept replaces the single tower by a set of thin and profiled arms, making the structure lighter and stiffer and saving on materials used, which leads to decreasing the LCOE.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionOperations & MaintenanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

14 days ago