offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Transformers Land on Norther Topside (VIDEO)
Grid Connection

April 24, 2018 · about 8 years ago

Transformers Land on Norther Topside (VIDEO)

Norther N.V. has shared a video showing the transformers being lifted into the Offshore High Voltage Station (OHVS) for the Norther offshore wind farm located in the Belgian North Sea.

1 minutes read
  • LinkedIn
  • X
  • Email

Norther N.V. has shared a video showing the transformers being lifted into the Offshore High Voltage Station (OHVS) for the Norther offshore wind farm located in the Belgian North Sea.

The OHVS topside is being fabricated at Engie Fabricom’s yard in Hoboken, Belgium.

Van Oord is the EPCI (Engineering, Procurement, Construction and Installation) contractor for the wind farm’s foundations, the OHVS, and the inter-array and export cables.

Sif and Smulders are in charge of the production of foundations and transition pieces, while Van Oord intends to deploy its offshore installation vessel Aeolus and cable-laying vessel Nexus for the transport and installation of the foundations and turbines.

The Final Investment Decision (FID) for the project was reached in December 2016, when MHI Vestas won a contract to provide 44 of its V164-8.0 MW turbines optimized to deliver a maximum output of 8.4MW.

Located some 23km from the port of Zeebrugge, the 370MW Norther offshore wind farm is scheduled for commissioning in 2019, when it will become Belgium’s largest wind farm.

The wind farm is being developed by Norther N.V., a joint venture between Elicio and Boreas with three sponsors, including Elicio NV (50%), Eneco (25%) and Mitsubishi Corporation (25%).

<span data-mce-type=”bookmark” style=”display: inline-block; width: 0px; overflow: hidden; line-height: 0;” class=”mce_SELRES_start”> </span>

Source: Norther Wind/ YouTube

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionOperations &amp; MaintenanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations &amp; Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations &amp; Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

14 days ago