offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Jan De Nul and Hitachi Team Up Offshore Changhua
Business & Finance

April 30, 2018 · about 8 years ago

Jan De Nul and Hitachi Team Up Offshore Changhua

Jan De Nul Group and Hitachi Ltd. have signed the contract with overall work for the manufacturing and installation of 21 5.2MW wind turbines for the Changhua offshore wind farm project in Taiwan.

2 minutes read
  • LinkedIn
  • X
  • Email

Jan De Nul Group and Hitachi Ltd have signed the contract with overall work for the manufacturing and installation of 21 5.2MW wind turbines for the Changhua offshore wind farm project in Taiwan.

Taiwan Power Company (TPC) plans to construct the 109.2MW wind farm off the coast of Fangyuan in Changhua County in Central Western Taiwan.

The work includes design, manufacturing and installation of all foundations and wind turbines as well as maintenance for a period of five years.

The overall project has a value of TWD 25 billion (approx. USD 800 million), of which two-thirds of the amount is for Jan De Nul and the remaining one-third is for Hitachi.

Jan De Nul will be responsible for the foundation design, fabrication and installation, wind turbine installation, supply and installation of cables off- and onshore as well as for the upgrading of the electrical substation.

Hitachi will be in charge of manufacturing, assembly, operation and maintenance (O&M), and other work related to the 21 offshore wind turbines with downwind rotor, which are particularly suited for regions prone to typhoons.

A particular feature of the design is that the foundations are designed to withstand cyclonic waves and winds, and earthquake loads, Jan De Nul said.

Seabed survey and geotechnical investigation will start in May 2018. Manufacturing of the foundations and wind turbines is planned mainly during 2019 in order to deliver them in early 2020.

Test operation of the equipment is targeted to start in the summer of 2020, and the completion is scheduled for the end of December of the same year.

Taiwan Power Company aims to achieve 1GW of operating offshore wind capacity by 2025, and 1.8GW by 2030.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceContracts & TendersOperations & MaintenancePorts & LogisticsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

12 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago
OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

12 days ago