offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›GE Goes Into Haliade-X 12 MW Details (Infographics)
Technology

May 10, 2018 · about 8 years ago

GE Goes Into Haliade-X 12 MW Details (Infographics)

GE Renewable Energy has revealed additional details on the size and power of the Haliade-X 12 MW offshore wind turbine.

2 minutes read
  • LinkedIn
  • X
  • Email

GE Renewable Energy has revealed additional details on the size and power of the Haliade-X 12 MW offshore wind turbine.

In March, GE announced it will invest more than USD 400 million over the next three to five years to develop and deploy the largest and most powerful offshore wind turbine to date – the Haliade-X 12 MW.

The first nacelle is expected to be available for demonstration in 2019, while the company aims to ship the first turbine units in 2021.

The Economics

According to the company, the combination of a bigger rotor, longer blades and higher capacity factor makes Haliade-X less sensitive to wind speed variations, improving predictability and the ability to generate more power at low wind speeds, which increases profits and lowers the levelized cost of energy.

With fewer machines and turbine foundations to install, in addition to reduced cycle times and simplified operation, the turbine generates robust savings on overall project cost (CAPEX Balance of Plant) over the life of a wind farm, saving an average of USD 26 million (approximately EUR 22 million) per turbine per 100MW when compared to Haliade 150-6 MW.

Digital tools, based on GE’s Predix platform, are currently being developed for the offshore environment with an operations approach, which is expected to help customers perform remote diagnostics, improve time management and optimize operations.

French Connection

The Haliade-X 12 MW wind turbine project will see an EUR 46 million investment in the company’s factory in Saint-Nazaire, France, in order to adapt the site for the nacelle assembly.

An additional EUR 75 million will be invested in Cherbourg for tooling, blade molds, assembly line and blade development.

The project is expected to create 550 direct jobs in Cherbourg over the course of the next three years, with around 100 jobs in 2018.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Technology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

22 days ago

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

22 days ago
Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago