offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Adwen Turbine Accident Probe Gets Down to Nuts and Bolts
Operations & Maintenance

May 14, 2018 · about 8 years ago

Adwen Turbine Accident Probe Gets Down to Nuts and Bolts

The nacelle of the damaged Adwen M5000 (AD 5-116) wind turbine will be replaced on the Alpha Ventus, Germany’s first offshore wind farm, with preparatory work scheduled to begin soon, the wind farm’s operator said.

2 minutes read
  • LinkedIn
  • X
  • Email

The nacelle of the damaged Adwen M5000 (AD 5-116) wind turbine will be replaced on the Alpha Ventus, Germany’s first offshore wind farm, with preparatory work scheduled to begin soon, the wind farm’s operator said.

As reported earlier, a rear part of the turbine’s nacelle broke off and fell into the sea . The operator has now revealed that the AV 07 turbine lost the nacelle roof, the sides, and the bottom in the incident.

What has been determined so far is that the bolts holding together the parts that fell off were broken or torn, however, it is still unclear why this happened, the operator said.

The operator plans to send a Service Operations Vessel and a crew of specialist technicians to carry out the disassembly of the damaged nacelle and the installation of the new one.

The damaged nacelle and the broken parts which have been gathered will be transferred to Bremerhaven where a team from Adwen will examine the unit in detail to determine the exact cause of the incident. The evaluation of the data recorded by the Condition Monitoring System is already in progress.

The 60MW Alpha Ventus wind farm comprises six Adwen M5000 wind turbines and six Senvion 5M turbines. The remaining five Adwen M5000 turbines, currently in the idling mode, are undergoing visual inspections.

Commisioned in April 2010, the wind farm is operated by Deutsche Offshore-Testfeld und Infrastructur GmbH & Co. KG (DOTI), a joint venture between EWE, E.ON and Vattenfall.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago