offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Giant Turbine Rises in Aberdeen Bay (Timelapse)
Vessels

May 16, 2018 · about 8 years ago

Giant Turbine Rises in Aberdeen Bay (Timelapse)

Vattenfall is currently installing eleven MHI Vestas wind turbines on the European Offshore Wind Deployment Centre (EOWDC) in the Aberdeen Bay, including the two of the most powerful wind turbines in the world.

1 minutes read
  • LinkedIn
  • X
  • Email

Vattenfall is currently installing eleven MHI Vestas wind turbines on the European Offshore Wind Deployment Centre (EOWDC) in the Aberdeen Bay, including the two of the most powerful wind turbines in the world.

The 93.2MW demonstration wind farm will comprise nine MHI Vestas 8.4MW turbines and two MHI Vestas turbines with a record-breaking capacity of 8.8MW, the first of which was installed in early April.

The video below shows the installation of one of the eleven turbines onto a suction bucket foundation by Swire Blue Ocean’s vessel, the Pacific Orca.

MHI Vestas has specially designed the V164-8.4 MW and V164-8.8 MW turbines which all have a tip height of 191 metres. Each blade is 80m long – slightly taller than Aberdeen’s Marischal College – and the 164m rotor has a circumference larger than that of the London Eye’s.

The EOWDC project is the first to pair suction bucket jacket foundations with the most powerful wind turbines in the market at commercial scale.

Photo and video: Vattenfall UK

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

15 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

15 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago