offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›Pacific Orca in Port of Esbjerg for Final EOWDC Load-Out
Ports & Logistics

May 18, 2018 · about 8 years ago

Pacific Orca in Port of Esbjerg for Final EOWDC Load-Out

Swire Blue Ocean’s jack-up Pacific Orca has arrived in the Port of Esbjerg to load the last four MHI Vestas turbines for Vattenfall’s European Offshore Wind Deployment Centre (EOWDC) in the Aberdeen Bay.

1 minutes read
  • LinkedIn
  • X
  • Email

Swire Blue Ocean’s jack-up Pacific Orca has arrived in the Port of Esbjerg to load the last four MHI Vestas turbines for Vattenfall’s European Offshore Wind Deployment Centre (EOWDC) in the Aberdeen Bay.

The 93.2MW project, also known as the Aberdeen offshore wind farm, comprises nine MHI Vestas 8.4MW turbines and two MHI Vestas 8.8MW turbines , the most powerful units in the world, being installed on suction bucket jacket foundations some three kilometres off Aberdeen.

The wind farm is expected to generate first power this summer and operate for the next 20 years.

Apart from generating electricity, the wind farm will also be a centre for testing and developing new technologies for offshore wind power.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Ports & LogisticsVesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

12 days ago

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

12 days ago
South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago