offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›SMST Springs Into Action for Hornsea One PSV
Vessels

May 22, 2018 · about 8 years ago

SMST Springs Into Action for Hornsea One PSV

SMST has equipped the Platform Supply Vessel (PSV) Eurus Express with a motion compensated gangway ahead of the vessel’s deployment on Orsted’s Hornsea Project One offshore wind farm in the UK.

1 minutes read
  • LinkedIn
  • X
  • Email

SMST has equipped the Platform Supply Vessel (PSV) Eurus Express with a motion compensated gangway ahead of the vessel’s deployment on Ørsted’s Hornsea Project One offshore wind farm in the UK.

The PSV was fitted with an SMST Telescopic Access Bridge (TAB) M-series just seven days after SMST and A1 Offshore Solutions ApS signed the rental contract, SMST said.

The Eurus Express, with Grimsby as home port, is contracted by GeoSea to support the installation of transition pieces on the offshore wind farm located 120km off the Yorkshire coast.

The vessel will be performing its work for a period of 45 days, with an optional extension of the rental period.

The 1.2GW Hornsea Project One consists of 174 7MW wind turbines scheduled to be commissioned in 2020.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

15 days ago

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

15 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

15 days ago
South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

15 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago