offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›All Borkum Riffgrund 2 Monopile Foundations Stand Tall
Wind Farm Update

May 28, 2018 · about 8 years ago

All Borkum Riffgrund 2 Monopile Foundations Stand Tall

Jan De Nul’s jack-up vessel Vole au vent has installed the last monopile foundation at Ørsted’s Borkum Riffgrund 2 offshore wind farm.

1 minutes read
  • LinkedIn
  • X
  • Email

Jan De Nul’s jack-up vessel Vole au vent has installed the last monopile foundation at Ørsted’s Borkum Riffgrund 2 offshore wind farm.

Vole au vent installed the first out of the 36 monopile foundations at the offshore site in the German North Sea in March.

The Germany-based Steelwind Nordenham manufactured the monopiles and transition pieces for the project, while Jan De Nul was in charge of the transport and installation of the structures as part of a contract secured in 2016.

In addition to the 36 monopiles, the wind farm’s 56 MHI Vestas 8MW wind turbines will be installed on 20 suction bucket jacket foundations.

The Borkum Riffgrund 2 offshore wind project is currently being built some 40km northwest of the island of Borkum next to the Borkum Riffgrund 1 wind farm.

The 450MW wind farm is expected to be fully commissioned next year.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

22 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

23 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

22 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

23 days ago