offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›MHI Vestas Marks V164 Turbine Milestone
Technology

May 28, 2018 · about 8 years ago

MHI Vestas Marks V164 Turbine Milestone

Jack-up vessel Bold Tern installed the eleventh MHI Vestas 8MW wind turbine on Ørsted’s Borkum Riffgrund 2 wind farm in the German North Sea on 26 May, which was the 100th MHI Vestas V164 turbine model to be installed worldwide.

1 minutes read
  • LinkedIn
  • X
  • Email

Jack-up vessel Bold Tern installed the eleventh MHI Vestas 8MW wind turbine on Ørsted’s Borkum Riffgrund 2 wind farm in the German North Sea on 26 May, which was the 100th MHI Vestas V164 turbine model to be installed worldwide.

The first V164-8.0 MW turbine was installed at Maade in Denmark in 2016. Since then, the model has been installed on the Burbo Bank Extension wind farm, the Walney Extension West , the Blyth offshore demonstrator project , and the European Offshore Wind Deployment Centre (EOWDC) , all in the UK.

The 450MW Borkum Riffgrund 2 wind farm will comprise 56 MHI Vestas 8MW turbines scheduled for commissioning in 2019. It is the first German wind farm to feature the largest commercial turbine in the market.

MHI Vestas also has firm orders for the V164 model to be used on the 406MW Horns Rev 3 wind farm in Denmark, the 252MW Deutsche Bucht in Germany, and the 370MW Norther in Belgium.

A conditional order has been signed for the Northwester 2 project in Belgium, and the preferred supplier agreements are in place for the 860MW Triton Knoll and the 950MW Moray East projects in the UK.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

TechnologyWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago
Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

16 days ago