offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Baltic Sea Boulder Removal Squad Wanted
Contracts & Tenders

June 1, 2018 · about 8 years ago

Baltic Sea Boulder Removal Squad Wanted

50Hertz Transmission GmbH has issued a tender for boulder removal services along the submarine export cable routes between the offshore wind farms in the German Baltic Sea and the landing point in Lubmin.

1 minutes read
  • LinkedIn
  • X
  • Email

50Hertz Transmission GmbH has issued a tender for boulder removal services along the submarine export cable routes between the offshore wind farms in the German Baltic Sea and the landing point in Lubmin.

The tender, part of the Cluster Westlich Adlergrund 2 Ostwind 2 project, is divided into three lots and covers the removal of all boulders with a diameter of 50cm or larger from three export cable corridors – OST-2-1, OST-2-2 and OST-2-3.

The corridor width is 12 metres, or 15m with water depths of more than 20m.

The OST-2-1 cable will connect the Arcadis Ost 1 offshore wind farm to the German grid, OST-2-2 is for the Baltic Eagle wind farm, and OST-2-3 will connect the Baltic offshore wind farm.

The tender remains open until 2 July.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersGrid ConnectionVesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

13 days ago

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

13 days ago
South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago