offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Rampion Unearths Ancient Execution Scene
Grid Connection

June 7, 2018 · about 8 years ago

Rampion Unearths Ancient Execution Scene

Human remains dating back to the 11th century were found during excavation work on the South Downs for the Rampion offshore wind farm, with the body showing signs of a traumatic death, E.ON said. Archaeologists from Archaeology South East, UCL, working on behalf of the Rampion project, uncovered the

2 minutes read
  • LinkedIn
  • X
  • Email

Human remains dating back to the 11th century were found during excavation work on the South Downs for the Rampion offshore wind farm, with the body showing signs of a traumatic death, E.ON said.

Archaeologists from Archaeology South East, UCL, working on behalf of the Rampion project, uncovered the well-preserved remains of the adult male aged 25 to 35 years in a well-cut grave in chalk bedrock on the south-western side of Truleigh Hill, north of Shoreham-by Sea.

The 1,000-year-old remains, thought to be an execution killing of around 1010-1025 AD, were found by archaeologists when surveying the route for the onshore cable which now carries power from the 400MW wind farm. The skeleton was recovered intact with the exception of missing a few small bones from the hands and feet. He was laid facing upwards with his arms at his side in an east west alignment, with no sign of a coffin.

The remains were excavated as part of the Rampion offshore wind farm development alongside environmental consultants RSK in accordance with standard and professional techniques. The skeleton’s age was established by radiocarbon dating which indicated death before the Norman Conquest, during a time known as the late Anglo Saxon period. Further analysis revealed signs of a physically active life ending violently with cuts to the neck.

The late Anglo Saxon remains were uncovered in 2015 during the wind farm construction process.

Archaeological remains spanning millennia from the late Neolithic through to the Bronze Age, Roman, mediaeval and post-medieval periods were uncovered during the survey and include finds of flint tools, pottery, pits and salt-working and watercress cultivation features.

An archaeology evening is being hosted by Rampion at the Ropetackle Arts Centre in Shoreham on Tuesday 12 June at 7 pm local time.

A number of archaeological finds uncovered during construction will be on display including the vertebrae from the Saxon skeleton showing cut marks, as well as a selection of prehistoric, Roman and medieval pottery and various flint tools.

The Rampion offshore wind farm, located 13km off the Sussex coast, is due to be fully operational later this year.

Photos: Archaeology South East/E.ON

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago