offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›GustoMSC and Barge Master Working Around US Jones Act
Ports & Logistics

June 18, 2018 · about 8 years ago

GustoMSC and Barge Master Working Around US Jones Act

GustoMSC and Barge Master have joined forces to develop a motion-compensated feeder solution for the first wave of US offshore wind projects.

1 minutes read
  • LinkedIn
  • X
  • Email

GustoMSC and Barge Master have joined forces to develop a motion-compensated feeder solution for the first wave of US offshore wind projects.

The two Netherlands-based companies adopted an integrated approach in order to comply with the Jones Act and overcome the operational restrictions of US ports. The Jones Act requires that any vessel transporting cargo between US ports, or between US ports and offshore facilities, is built and flagged in the US.

The proposed solution places the motion-compensated platform BM-T700 on a US flagged offshore vessel or a seagoing barge in order to feed the wind turbine components to the offshore installation site to be installed by a wind turbine installation jack-up.

Barge Master introduced the BM-T700 platform in 2013. By compensating the motions of the vessel, the platform creates a stable lift-off base for a maximum weight of 700 tons in sea states up to Hs 2.5 meter and is Lloyd’s certified under the lifting appliances rules.

GustoMSC will perform the naval engineering and the integration of the BM-T700 platform onto a new or existing DPII feeder barge.

Although GustoMSC sees sufficient potential for larger purpose-built Jones Act compliant installation jack-ups to cope with the expected increase in turbine size, weights and hub heights, this is a solid solution for the first wave of US projects within the remaining timeframe, the company said.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Ports & LogisticsR&DTechnologyVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

14 days ago

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

14 days ago
Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

15 days ago