offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›First Monopile In at Trianel Windpark Borkum II
Wind Farm Update

June 29, 2018 · about 8 years ago

First Monopile In at Trianel Windpark Borkum II

Seaway Heavy Lifting’s (SHL) vessel Stanislav Yudin has installed the first monopile at the Trianel Windpark Borkum II (TWB II) in Germany.

1 minutes read
  • LinkedIn
  • X
  • Email

Seaway Heavy Lifting’s (SHL) vessel Stanislav Yudin has installed the first monopile at the Trianel Windpark Borkum II (TWB II) in Germany.

The monopiles, weighing up to 900 tonnes, and their corresponding 300-tonne transition pieces are transported on barges from Nordenham to the construction site.

The 73 meters long monopiles are driven about 30 meters deep into the seabed with a hydraulic hammer and about 4,000 pile driving strokes. The transition pieces are then bolted to them with 120 screws.

The 200MW wind farm will comprise 32 Senvion 6.2M152 turbines, which are expected to be commissioned by the end of 2019.

TWBII is owned by EWE AG with a share of 37.5 percent and a joint venture of the power utility of the city of Zurich with 24.51 percent. The Stadtwerke-Kooperation Trianel together with 17 municipal utilities from Germany hold a share of 37.99 percent.

The total investment for the TWB II offshore wind farm amounts to around EUR 800 million.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

22 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

23 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

22 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

23 days ago