offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Nordsee Ost OWF Covered with WiFi
Operations & Maintenance

July 4, 2018 · about 8 years ago

Nordsee Ost OWF Covered with WiFi

Belgium-based company nCentric has delivered a wireless solution to provide internet at the Nordsee Ost offshore wind farm in Germany and the vessels working on it.

1 minutes read
  • LinkedIn
  • X
  • Email

Belgium-based company nCentric has delivered a wireless solution to provide internet at the Nordsee Ost offshore wind farm in Germany and the vessels working on it.

The company has been hired by Senvion to provide at least a 20Mbps internet connection towards every vessel working in and around the 295MW offshore wind farm, located approximately 35 kilometres north of the island of Heligoland in the German North Sea.

Nordsee Ost , owned by innogy, comprises 48 Senvion 6.2M126 turbines and was fully commissioned in May 2015. Senvion is responsible for servicing the turbines during the first five years of operation, with options to extend the contract.

Earlier this year, nCentric also installed wireless communication systems onboard A2Sea’s jack-up vessel Sea Installer for offshore installation works at the Rentel wind farm in Belgium.

The Belgian company also provided a high bandwidth inter-vessel communication system for the Northwind wind farm in Belgium in 2013.

Offshore WIND Staff

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceTechnologyVesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago