offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Authorities›Thanet Extension DCO Application All Set for Examination
Authorities

July 24, 2018 · about 8 years ago

Thanet Extension DCO Application All Set for Examination

The UK Secretary of State has accepted for examination Vattenfall’s application for the development consent order (DCO) for the Thanet Extension offshore wind project.

1 minutes read
  • LinkedIn
  • X
  • Email

The UK Secretary of State has accepted for examination Vattenfall’s application for the development consent order (DCO) for the Thanet Extension offshore wind project.

The UK Planning Inspectorate now has approximately three months to prepare for the examination, which includes appointing an examining authority for the process.

To remind, the Swedish energy company submitted the application for the DCO to the Inspectorate on 27 June, after which a 28-day review process took place.

The Secretary of State is expected to decide on the application by the middle of next year. If approved, Thanet Extension will extend the 300MW Thanet offshore wind farm.

The proposed wind farm will consist of up to 34 turbines located 8km offshore Kent, potentially doubling the output of the existing 100-turbine wind farm with more powerful machines.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Authorities

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

27 days ago

700 MW Lithuanian Offshore Wind Project Gets Environmental Protection Agency’s Green Light
Authorities

700 MW Lithuanian Offshore Wind Project Gets Environmental Protection Agency’s Green Light

about 1 month ago

CIP Secures 1 GW Across Two Projects in South Korea’s Offshore Wind Auction
Authorities

CIP Secures 1 GW Across Two Projects in South Korea’s Offshore Wind Auction

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

27 days ago
700 MW Lithuanian Offshore Wind Project Gets Environmental Protection Agency’s Green Light
Authorities

700 MW Lithuanian Offshore Wind Project Gets Environmental Protection Agency’s Green Light

about 1 month ago
CIP Secures 1 GW Across Two Projects in South Korea’s Offshore Wind Auction
Authorities

CIP Secures 1 GW Across Two Projects in South Korea’s Offshore Wind Auction

about 1 month ago