offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›Edda Mistral Heads Out for Sea Trials
Ports & Logistics

August 17, 2018 · about 8 years ago

Edda Mistral Heads Out for Sea Trials

The Service Operation Vessel (SOV) Edda Mistral has left the Ria del Eo, Spain, to head towards the Port of Gijón where the vessel will complete her sea trials over the next weeks.

1 minutes read
  • LinkedIn
  • X
  • Email

The Service Operation Vessel (SOV) Edda Mistral has left the Ria del Eo, Spain, to head towards the Port of Gijón where the vessel will complete her sea trials over the next weeks.

Built by Spain’s Gondan for the Norwegian shipowner Østensjø Rederi A / S, Edda Mistral will operate on Ørsted’s Hornsea Project One wind farm in the UK. Her sister vessel, Edda Passat, also built by Gondan for Østensjø Rederi, is deployed on Ørsted’s Race Bank wind farm in the UK.

Both vessels have contracts for a fixed period of five years, plus five one-year options.

With 81m in length and a 17m beam, the vessels have the capacity to accommodate a crew of up to 20 people and up to 40 technicians who will perform maintenance tasks at the wind farms.

Both vessels are equipped with a 23-meter-long Uptime heave compensated walk-to-work gangway, a 3D compensated crane and a CTV landing system with bunkering facility. In addition to the gangway, the vessels are equipped with a Helideck and an 11m daughter craft.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Ports & LogisticsVesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

12 days ago

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

12 days ago
South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago