offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›JFMS Replaces Gearbox Oil on Thornton Bank Turbines
Operations & Maintenance

August 21, 2018 · about 8 years ago

JFMS Replaces Gearbox Oil on Thornton Bank Turbines

James Fisher Marine Services (JFMS) has completed a gearbox oil change project at the Thornton Bank offshore wind farm in Belgium.

1 minutes read
  • LinkedIn
  • X
  • Email

James Fisher Marine Services (JFMS) has completed a gearbox oil change project at the Thornton Bank offshore wind farm in Belgium.

This is the second such project for JFMS at the offshore wind farm, with the scope including the removal and replacement of gearbox oil on 25 Senvion 6 MW turbines and two 5 MW ones.

JFMS said it had carried out the operations using its Ship-to-Turbine™ system, which helped reduce turbine downtime by some 50% and improved technician utilisation.

The 325 MW Thornton Bank (C-Power) is Belgium’s first offshore wind farm, built in three phases and operational since 2013.

During the first phase, six Senvion 5 MW wind turbines were erected on gravity-based foundations and the phase was commissioned in 2009. Thornton Bank II consists of 24 Senvion 6 MW wind turbines installed on jacket foundations that were fully commissioned at the beginning of 2013. The third phase also comprises 24 Senvion 6 MW wind turbines, which have been producing electricity since July 2013.

Offshore WIND Staff

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

13 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

13 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago