offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›NKT All Done at Walney Extension
Grid Connection

September 4, 2018 · about 8 years ago

NKT All Done at Walney Extension

NKT has commissioned the high-voltage cable system on the 659MW Walney Extension offshore wind farm in the Irish Sea.

1 minutes read
  • LinkedIn
  • X
  • Email

NKT has commissioned the high-voltage cable system on the 659MW Walney Extension offshore wind farm in the Irish Sea.

For NKT, the scope of works included the delivery of more than 139km of submarine cables and the commissioning of the 220kV HVAC cable systems.

NKT has designed, manufactured and commissioned the two 220kV extruded export cable systems as well as an underground cable system connecting the wind farm to the onshore power grid. All 220kV joints and terminations were also supplied and installed by NKT.

”We are proud to be part of the ambitious project generating renewable energy in UK and we have seen great collaboration with Ørsted and other suppliers to the Walney Extension. In NKT, we are committed to the sustainable development of the global energy production, and this project reinforces our position as a leading provider of advanced high-voltage cable solutions connecting offshore wind parks to the power grid,” said Executive Vice President Andreas Berthou , who is responsible for high-voltage cable solutions in NKT.

When fully operational later this year, Walney Extension will become the world’s largest offshore wind farm.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

16 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

16 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago