offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Half of Trianel Borkum II Foundations Settled
Wind Farm Update

September 5, 2018 · about 8 years ago

Half of Trianel Borkum II Foundations Settled

Seaway Heavy Lifting’s (SHL) vessel Stanislav Yudin has installed 16 out of 32 monopile foundations at the Trianel Windpark Borkum II in the German North Sea.

1 minutes read
  • LinkedIn
  • X
  • Email

Seaway Heavy Lifting’s (SHL) vessel Stanislav Yudin has installed 16 out of 32 monopile foundations at the Trianel Windpark Borkum II in the German North Sea.

The vessel installed the first foundation at the offshore site some 40km north of the island of Borkum at the end of June.

The monopiles and transition pieces are transported by barges from Nordenham to the 203MW wind farm, where they are then driven circa 30m into the seabed with a hydraulic hammer and about 4,000 pile driving strokes.

Trianel Windpark Borkum II will comprise 32 Senvion 6.33MW turbines. The units, which will be installed by Jan De Nul, are slated for full commissioning by the end of next year.

The project is owned by EWE AG with a share of 37.5% and a joint venture of the power utility of the city of Zurich with 24.51%. The Stadtwerke-Kooperation Trianel together with 17 municipal utilities from Germany hold a share of 37.99%.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

23 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

24 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

25 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

23 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

24 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

25 days ago