offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Viking Welcome for Jan De Nul’s New Jack-Up
Grid Connection

September 25, 2018 · about 7 years ago

Viking Welcome for Jan De Nul’s New Jack-Up

Jan De Nul has utilised a recently acquired wind farm installation vessel, Taillevent, on an offshore wind project in the German Baltic Sea.

2 minutes read
  • LinkedIn
  • X
  • Email

Jan De Nul has utilised a recently acquired wind farm installation vessel, Taillevent, on an offshore wind project in the German Baltic Sea.

Taillevent, formerly MPI Discovery, was acquired by Jan De Nul from MPI Offshore this summer.

The jack-up’s first task was to complete the installation of a new 83-tonne crane on the offshore substation of the 350MW Wikinger (Viking) offshore wind farm.

The Wikinger, operated by Iberdrola, is connected to the German power grid and supplies green energy to approximately 350,000 homes on the island of Rügen.

Offshore renewables is a business in which Jan De Nul Group is investing heavily to further strengthen its position in this industry, the company said.

“In the past decade, we invested a lot in staff and equipment for our offshore activities. More specifically for the installation of offshore wind farms, we acquired two specialized offshore installation vessels: the Vole au vent in 2015 and the Taillevent this summer,” said Peter De Poote r, Offshore Renewables Manager at Jan De Nul Group.

“Meanwhile more expansion plans are being developed within our new-building department. These investments are key for Jan De Nul Group’s growth.”

Taillevent was built by China’s Cosco Nantong in 2011 and was specifically designed to transport, lift and install offshore wind turbines and foundations. The vessel features a 1,000-tonne main crane, plus a 50-tonne auxiliary crane, has a maximum operating depth of 40 metres, a deadweight of 6,000 tonnes, and can accommodate 112 persons.

The jack-up is 138.5 metres long and is equipped with six legs to lift itself above the sea level for stable working without the impact of waves.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

18 days ago

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

18 days ago
Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

19 days ago