offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Vuyk Floats Offshore Port Concept
Operations & Maintenance

October 15, 2018 · about 7 years ago

Vuyk Floats Offshore Port Concept

A mobile offshore port concept being developed by Vuyk Engineering Rotterdam in combination with efficient installation vessels could reduce the transport and installation time on offshore wind projects by nearly 20%, the Dutch engineering specialist said.

1 minutes read
  • LinkedIn
  • X
  • Email

A mobile offshore port concept being developed by Vuyk Engineering Rotterdam in combination with efficient installation vessels could reduce the transport and installation time on offshore wind projects by nearly 20%, the Dutch engineering specialist said.

Demands to build offshore wind projects as cost-efficiently as possible are found to be fulfilled by the presence of an offshore port near the offshore wind farm during the construction period. However, in order to make such a port commercially attractive, it should be easily transportable for utilizing it on multiple wind farm projects over its lifetime, Vuyk said.

The high potential concepts are a single floating structure, a single jack-up structure, and a small jack-up and a floating structure. Based on the analysis, all three port concepts are expected to be profitable, according to Vuyk.

The port concepts are focusing on the installation of offshore wind turbines.

Each concept has a storage area of 17,500m2 and one quay to load and unload the turbines. The turbines are supplied by dedicated feeder vessels, while installation is executed by optimized installation vessels.

Prior to this, foundations of varying sizes and types need to be installed. The current development in this market moves to the floating installation of the foundations and transition pieces, the company said. In parallel with the offshore port research, Vuyk simultaneously developed a vessel for installation of the next generation wind turbine foundations.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenancePorts & LogisticsR&DTechnologyVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

13 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

13 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago