offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›R&D›TWD Brings Out the Hammock
R&D

October 18, 2018 · about 7 years ago

TWD Brings Out the Hammock

The Netherlands-based Temporary Works Design (TWD) has introduced a Hammock monopile seafastening that is said to accommodate foundations with a diameter of up to 11 metres without any changes to the support structure.

1 minutes read
  • LinkedIn
  • X
  • Email

The Netherlands-based Temporary Works Design (TWD) has introduced a Hammock monopile seafastening that is said to accommodate foundations with a diameter of up to 11 metres without any changes to the support structure.

The seafastening consists of two supports fixed to the deck of the vessel either transversally, across the vessel, or longitudinally, from bow to stern. One side of the support is fixed rigidly upright while the opposite side frame is hinged at the base. A specially designed rope is slung between the two sides in a cross-over pattern, designed to avoid lateral movement of the monopile.

When loading the monopile on to the vessel the hinged support frame is held open and, as the ropes take the weight of the monopile, this support automatically closes. Contact pads on the upper horizontal part of the frame will come to rest on the monopile securing the lateral support.

Stacking a second frame on top of the bottom support frame is possible, TWD said. The upper support frame is then equipped with a hydraulically operated lifting arm to raise the rope to one side to give access to the monopile below.

The whole seafastening uses less steel than conventional designs saving on cost and weight, according to TWD. Mobilization and demobilization time between projects will also be faster and easier.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

R&DTechnology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less
Industry

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

21 days ago

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

22 days ago

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

22 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less
Industry

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

21 days ago
Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

22 days ago
New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

22 days ago