offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Jan De Nul Settles in Taichung Port
Business & Finance

November 6, 2018 · about 7 years ago

Jan De Nul Settles in Taichung Port

Jan De Nul has signed a Memorandum of Understanding (MoU) with the Taiwan International Ports Corporation (TIPC) to establish a logistics hub at the Taichung Port for the Formosa 1 Phase 2 project.

1 minutes read
  • LinkedIn
  • X
  • Email

Jan De Nul has signed a Memorandum of Understanding (MoU) with the Taiwan International Ports Corporation (TIPC) to establish a logistics hub at the Taichung Port for the Formosa 1 Phase 2 project.

Jan De Nul has agreed to lease 7.6 hectares of space in the Taichung Port which will be used as the storage, assembly and load-out area for the Formosa 1 Phase 2’s monopile foundations and other underwater infrastructure.

The 120MW wind farm, due to be completed in the second half of 2019, will comprise 20 Siemens Gamesa 6MW wind turbines and is the first commercial offshore wind farm to be built in Taiwan.

Back in May, Jan De Nul won a contract to design, procure and install 20 monopile foundations on the wind farm. The scope of works also includes scour protection and cable installation.

The wind farm is owned by Formosa Wind Power Co., a partnership of Macquarie Capital Group Limited (50%), Ørsted AS (35%) and Swancor Renewable Energy Co. Ltd (15%).

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceContracts & TendersPorts & LogisticsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago