offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Lankhorst Dyneema Tethers WindFloat Atlantic
Wind Farm Update

November 20, 2018 · about 7 years ago

Lankhorst Dyneema Tethers WindFloat Atlantic

The 25MW WindFloat Atlantic floating project in Portugal has used the first ever Lankhorst Dyneema DM20 mooring tethers.

1 minutes read
  • LinkedIn
  • X
  • Email

The 25MW WindFloat Atlantic floating project in Portugal has used the first ever Lankhorst Dyneema DM20 mooring tethers.

According to the project developer Windplus SA, this is the first application of Gama98 Dyneema DM20 fiber ropes as mooring lines.

The three WindFloat 8MW turbines will be moored at a water depth of between 85m to 100m some 20km off the coast from Viana do Castelo.

Mooring systems of the turbines are made up of three catenary mooring lines of Gama98 rope construction made from Dyneema DM20 attached to chain and drag embedded anchors. The soft catenary mooring system will restrain the turbine’s horizontal motions, Windplus said.

The ease of High Modulus Poly-Ethylene (HMPE) rope handling is expected to result in lower costs compared to spiral strand steel wire both during installation and future disconnection. The mooring lines will be pre-laid on the seabed, prior to the arrival of the turbines and connected using platform mooring connectors, the company stated.

“The WindFloat Atlantic Project is a significant mooring project. It marks the first ever use of Gama98 Dyneema DM20 as mooring tethers in any offshore mooring application,” said Alberto Leao , Sales Renewable Energy, Lankhorst Euronete Portugal.

“The mooring characteristics of Gama98 Dyneema DM20 makes it an ideal for offshore mooring projects and places Lankhorst at the forefront as the Fibre World Technological Leader on Mooring.”

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

24 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

25 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

24 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

25 days ago