offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›R&D›TEPCO to Celebrate New Year with First Commercial Turbine
R&D

December 6, 2018 · about 7 years ago

TEPCO to Celebrate New Year with First Commercial Turbine

Tokyo Electric Power Company Holdings Inc. (TEPCO) is launching its first commercial offshore wind turbine in Choshi, Japan, on 1 January 2019.

1 minutes read
  • LinkedIn
  • X
  • Email

Tokyo Electric Power Company Holdings Inc. (TEPCO) is launching its first commercial offshore wind turbine in Choshi, Japan, on 1 January 2019.

Located south of Choshi in the Chiba Prefecture, the MWT92/2.4 turbine has a 2.4MW rated output and is installed on a bottom-fixed foundation.

TEPCO began conducting research offshore Choshi in August 2009 under a public initiative launched by the New Energy and Industrial Technology Development Organization (NEDO).

Since 2013, the two parties have been testing the country’s first offshore wind power generation facility. During the demonstration, test data was monitored with the aim of confirming technologies necessary to introduce and expand offshore wind projects.

The Japanese company said the demonstration brought experience in operating and maintaining the turbine in harsh weather and marine conditions, as well as ensuring equipment safety and resistance to damage from salt water, which as a result, proved the unit is safe and can be operated at a high capacity factor.

As a result, it was also confirmed that the fairly shallow depths and high winds along the Chiba coast offer excellent conditions for an offshore wind farm.

In mid-November, TEPCO began a seabed survey off the Chiba coast to ascertain the bedrock structure of the seabed for a possible project.

A boring survey offshore Choshi, Asahi, Sosa, and Yokoshibahikari will be carried out until the end of January 2019.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

R&DTechnology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

22 days ago

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

22 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

22 days ago
New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

22 days ago