offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›China’s Farthest Offshore Wind Farm All Hooked Up
Grid Connection

December 26, 2018 · about 7 years ago

China’s Farthest Offshore Wind Farm All Hooked Up

The 302.4MW Dafeng H3 offshore wind farm has reached full capacity after the final of the 72 wind turbines was connected to the Chinese grid on 20 December.

1 minutes read
  • LinkedIn
  • X
  • Email

The 302.4MW Dafeng H3 offshore wind farm has reached full capacity after the final of the 72 wind turbines was connected to the Chinese grid on 20 December.

The wind farm is located in the East China Sea and comprises 72 Envision 4.2MW turbines installed on monopile foundations.

Located some 43 kilometres off the coast of the Jiangsu Province, Dafeng H3 is China’s farthest offshore wind farm.

According to local media, the wind farm was put into operation 202 days after the official start of construction.

State Power Investment Corporation (SPIC) is the owner and developer of the wind farm. The Balance of Plant contractor on the project was Huadian Heavy Industry.

Photos: SPIC

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago