offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Seajacks Zaratan Getting Ready for Taiwan
Vessels

January 30, 2019 · about 7 years ago

Seajacks Zaratan Getting Ready for Taiwan

The self-propelled jack-up Seajacks Zaratan is on its way to Vlissingen in the Netherlands to undergo mobilisation in preparation for the Formosa 1 Phase 2 offshore wind project in Taiwan. Seajacks Zaratan will install all 20 Siemens Gamesa SWT-6.0-154 wind turbines on the 120MW wind farm in the Tai

1 minutes read
  • LinkedIn
  • X
  • Email

The self-propelled jack-up Seajacks Zaratan is on its way to Vlissingen in the Netherlands to undergo mobilisation in preparation for the Formosa 1 Phase 2 offshore wind project in Taiwan.

Seajacks Zaratan will install all 20 Siemens Gamesa SWT-6.0-154 wind turbines on the 120MW wind farm in the Taiwan Strait. This is the first renewables contract for Seajacks outside Europe.

The installation works are scheduled to start in the second quarter of 2019.

The project is located around six kilometers off the west coast of the Miaoli district with water depths ranging between 15 and 30 metres. The turbines will be installed on monopile foundations .

Once fully built in the second half of 2019 and fully operational in 2020, the Formosa 1 will have the capacity of 128MW.

The Formosa 1 Phase 1 comprises two 4MW Siemens Gamesa wind turbines, which have been in operation since May 2017, and is Taiwan’s first operating wind farm.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

16 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

16 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago