offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›MacArtney Automated Concept Tool for Chinese Wind Turbine Maker
Technology

January 31, 2019 · about 7 years ago

MacArtney Automated Concept Tool for Chinese Wind Turbine Maker

MacArtney has secured an order from Shanghai Electric Wind Power Group to develop an automated concept for Hub Generator Tightening Tool (HGT) to improve mechanisation and reduce human interaction in wind turbine maintenance. The HGT tool consists of two parts – a Turner tool that creates the rotati

1 minutes read
  • LinkedIn
  • X
  • Email

MacArtney has secured an order from Shanghai Electric Wind Power Group to develop an automated concept for Hub Generator Tightening Tool (HGT) to improve mechanisation and reduce human interaction in wind turbine maintenance.

The HGT tool consists of two parts – a Turner tool that creates the rotation of the generator, and an automatic bolt tool for torquing.

Prior to torquing each bolt, the hub/generator is positioned using an optical sensor system that ensures the correct location under the nacelle.

The tightening of the bolts is then carried out in two stages. The first stage is to initiate the fully automated process of rotating the generator and pre-tightening the bolts. During stage two of the bolt torquing sequence, all bolts are correctly torqued and stamped with a ‘Torque Approved’ mark to provide a reference for manual inspection, thus illustrating the bolts are correctly tightened.

The automated process of the HGT tool is said to reduce human exposure and thereby improve safety with the additional benefit of reducing labour hours.

Throughout this process, data is continuously accessible and presented in real time by the HMI control system, MacArtney said. The torque process is monitored throughout and logged in the quality control report.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Technology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

22 days ago

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

22 days ago
Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago