offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Authorities›EU Nods to JERA Joining Formosa I Offshore Wind Project
Authorities

February 4, 2019 · about 7 years ago

EU Nods to JERA Joining Formosa I Offshore Wind Project

The European Commission has approved, under the EU Merger Regulation, the proposed acquisition of joint control over Formosa I offshore wind project in Taiwan by Macquarie, Ørsted, Swancor, and Japan’s utility JERA. Formosa 1 is currently a joint venture between Ørsted (35% ownership), Taiwanese dev

1 minutes read
  • LinkedIn
  • X
  • Email

The European Commission has approved, under the EU Merger Regulation, the proposed acquisition of joint control over Formosa I offshore wind project in Taiwan by Macquarie, Ørsted, Swancor, and Japan’s utility JERA.

Formosa 1 is currently a joint venture between Ørsted (35% ownership), Taiwanese developer Swancor Renewable (15%), and Macquarie Capital (50%).

As reported, JERA agreed to acquire a combined 32.5% equity interest in the 128MW project offshore Miaoli county from Macquarie and Swancor.

The Commission concluded that the proposed transaction would raise no competition concerns as the wind farm will operate in Taiwan. The transaction was examined under the simplified merger review procedure.

After receiving the necessary regulatory approvals, the project will be owned by Ørsted (35%), JERA (32.5%), Macquarie Capital (25%), and Swancor (7.5%).

Once operational in late 2019, Formosa I will be Taiwan’s first utility-scale offshore wind farm. The 8MW Formosa 1 Phase 1 wind farm, comprising two Siemens 4MW wind turbines, has been operational since April 2017.

The Formosa 1 Phase 2 comprises 20 Siemens Gamesa 6 MW turbines. The wind farm is currently under construction.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

AuthoritiesWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

19 days ago

France Reveals Normandy Offshore Wind Tender Finalists
Authorities

European Commission Greenlights France’s EUR 63 Billion Aid Scheme to Build 11 Offshore Wind Farms

20 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

19 days ago
France Reveals Normandy Offshore Wind Tender Finalists
Authorities

European Commission Greenlights France’s EUR 63 Billion Aid Scheme to Build 11 Offshore Wind Farms

20 days ago