offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Marlinks Wins Northwester 2 Cable Monitoring Gig
Contracts & Tenders

February 19, 2019 · about 7 years ago

Marlinks Wins Northwester 2 Cable Monitoring Gig

The Belgium-based Marlinks has secured a contract for monitoring the cable burial depth of the Northwester 2 offshore wind farm. Marlinks will monitor the burial depth of six inter-array cables and one export cable, which will be equipped by the company’s distributed temperature sensing (DTS) measur

1 minutes read
  • LinkedIn
  • X
  • Email

The Belgium-based Marlinks has secured a contract for monitoring the cable burial depth of the Northwester 2 offshore wind farm.

Marlinks will monitor the burial depth of six inter-array cables and one export cable, which will be equipped by the company’s distributed temperature sensing (DTS) measurement system.

According to Parkwind, the majority owner of the 219MW project, the system uses the recorded temperatures and soil conditions to continuously calculate power circuit ratings and burial depth of the cables allowing an accurate follow-up on risk for failure.

The hardware will be installed on the substation in May, with the system expected to be fully operational when all cables are installed in October.

“One of the challenges over the lifetime of an offshore wind farm in the Belgian concession zone is to monitor and maintain correct burial depth of the cables. Marlinks provides an innovative monitoring solution allowing for up to date risk assessment,” said Peter Caluwaerts , Project Director of Northwester 2.

Norddeutsche Seekabelwerke GmbH (NSW) will deliver the inter-array cable, while Nexans is in charge of supplying the export cable. Tekmar Energy will provide the cable protection system (CPS).

Northwester 2 will comprise 23 MHI Vestas Offshore Wind 164-9.5MW turbines located some 51km off the Belgian coast. Offshore construction is expected to start in June 2019 and the commissioning is scheduled for 2020.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersGrid ConnectionTechnology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

17 days ago

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

20 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

17 days ago
Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

20 days ago