offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Corell Services Joins Formosa 1 Team
Contracts & Tenders

February 22, 2019 · about 7 years ago

Corell Services Joins Formosa 1 Team

UK-based Correll Services Ltd has secured a contract to provide subsea and land cable termination and testing works on the Formosa 1 Phase 2 offshore wind farm in Taiwan. The contract has been awarded by Formosa 1 project turnkey contractor Jan De Nul Group. Correll Services – a specialist in high v

1 minutes read
  • LinkedIn
  • X
  • Email

UK-based Correll Services Ltd has secured a contract to provide subsea and land cable termination and testing works on the Formosa 1 Phase 2 offshore wind farm in Taiwan.

The contract has been awarded by Formosa 1 project turnkey contractor Jan De Nul Group .

Correll Services – a specialist in high voltage, low voltage and fibre optical engineering, installation and maintenance – will be in charge of project documentation, export cable (HV & FO) jointing at the TJB and OSS, array cable terminations (HV & FO) on 22 assets, and post-installation testing from the OSS to offshore assets.

Sam Dowey , Managing Director at Correll Services, said: “We feel privileged to have been selected by Jan De Nul Group to work alongside them on this very prestigious project. For us to be completing the cable T & T works on the first major offshore windfarm in Taiwanese waters, is a fantastic achievement. In association with our parent company, RTS Wind AG, we have opened a branch office in Taiwan and look forward to developing further business opportunities in the region.”

The 120MW Formosa 1 Phase 2 is being developed some 6 kilometres off the west coast of the Miaoli district in the Taiwan Strait. The wind farm comprises 20 Siemens Gamesa 6MW wind turbines scheduled to be operational in 2020.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersGrid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago