offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Ørsted Picks G-tec for Geotechnical Work Offshore Germany
Contracts & Tenders

April 1, 2019 · about 7 years ago

Ørsted Picks G-tec for Geotechnical Work Offshore Germany

Ørsted has awarded Belgium’s G-tec with contracts to provide geotechnical engineering services on two offshore wind farms in the German Bight. Under the two individual contracts, G-tec will in 2019 carry out geotechnical investigations and laboratory analysis of samples taken from the seabed in vari

1 minutes read
  • LinkedIn
  • X
  • Email

Ørsted has awarded Belgium’s G-tec with contracts to provide geotechnical engineering services on two offshore wind farms in the German Bight.

Under the two individual contracts, G-tec will in 2019 carry out geotechnical investigations and laboratory analysis of samples taken from the seabed in various depths within the Gode Wind offshore wind farm 03 and 04 and the German Cluster offshore wind farm 01.

For Gode Wind offshore wind farm 03 and 04, the contract includes a detailed geotechnical site investigation on all turbine locations including in-situ tests and sampling, and subsequent onshore laboratory testing. The contract also includes an option for in-situ stiffness measurements.

On German Cluster offshore wind farm 01, G-tec will carry out a preliminary geotechnical site investigation on selected positions of geological interest including in-situ tests and sampling, and subsequent onshore laboratory testing.

Gode Wind 3 and 4 projects have a total capacity of 241.75MW. Gode Wind 3 was selected in the first German offshore wind auction, and Gode Wind 4 in the second auction . The two wind farms are scheduled to be commissioned by 2024/2025, subject to a final investment decision.

The capacity and the potential timeline for the German Cluster offshore wind farm 01 is unknown.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

18 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

18 days ago