offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›Windhoist Assembles Final Beatrice Tower
Ports & Logistics

April 10, 2019 · about 7 years ago

Windhoist Assembles Final Beatrice Tower

Windhoist Limited has pre-assembled the 84th and final wind turbine tower on the Beatrice Pre-Assembly Project at Nigg Energy Park in Scotland. Siemens Gamesa awarded Windhoist with a contract to carry out wind turbine pre-assembly work for the 588MW Beatrice wind farm in May 2018, marking the Scott

1 minutes read
  • LinkedIn
  • X
  • Email

Windhoist Limited has pre-assembled the 84th and final wind turbine tower on the Beatrice Pre-Assembly Project at Nigg Energy Park in Scotland.

Siemens Gamesa awarded Windhoist with a contract to carry out wind turbine pre-assembly work for the 588MW Beatrice wind farm in May 2018, marking the Scottish company’s first foray into offshore wind.

Under the contract, Windhoist is providing onshore pre-construction support for 84 Siemens 7MW turbines being installed at the wind farm in the Scottish Moray Firth.

Swire Blue Ocean’s jack-up is loading the turbines in sets of five at the Nigg port, Siemens Gamesa’s pre-assembly base, and installing them at the site 13 kilometres off the Caithness coast. The wind turbines are being commissioned shortly after the installation.

Beatrice wind farm is owned and developed by Beatrice Offshore Windfarm Limited (BOWL), a joint venture partnership between SSE (40%), Copenhagen Infrastructure Partners (35%) and Red Rock Power Limited (25%).

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Ports & LogisticsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago