offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›CMHI’s Wind Turbine Shuttle Design Gets DNV GL Certificate
Vessels

April 17, 2019 · about 7 years ago

CMHI’s Wind Turbine Shuttle Design Gets DNV GL Certificate

DNV GL has presented China Merchants Heavy Industry (CMHI) with an Approval in Principle (AiP) certificate for a wind turbine shuttle design. Unlike other wind farm installation vessels, the WTS has a small waterplane area twin hull (SWATH) design, DNV GL said. This results in very low resistance at

2 minutes read
  • LinkedIn
  • X
  • Email

DNV GL has presented China Merchants Heavy Industry (CMHI) with an Approval in Principle (AiP) certificate for a wind turbine shuttle design.

Unlike other wind farm installation vessels, the WTS has a small waterplane area twin hull (SWATH) design, DNV GL said.

This results in very low resistance at the design draught (16m) and excellent seakeeping performance, good motion behaviour characteristics, and high transit speed of 14 knots.

Capable of transporting and installing two fully assembled wind turbines or two wind turbine foundations, the vessel has a highly redundant dynamic positioning system installed and the wind turbine hoist tackles are equipped with an active system to compensate for the heave motion of the vessel, according to DNV GL.

The WTS can provide a “one-piece” installation service for wind turbines, as well as jacket foundations, piles, and other components. The design was assessed according to the class notations: 1A Column-stabilised Wind turbine installation unit Crane-offshore DYNPOS(AUTRO) E0.

DNV GL’s Head of Technical Centre China Falk Rothe handed over the certificate to Dr. Lixin Xu from China Merchants Offshore Technology and Research Center (CM-OTRC).

“CMHI and DNV GL have been partners in strategic cooperation for many years. Together, we both aim to not only set industry standards in ship and offshore unit designs, but contribute to safer and more environmental-friendly operation,” said Norbert Kray , DNV GL’s Regional Manager Greater China.

“We are very grateful that CMHI have made us their first choice for classification services for these two projects and we look forward to strengthening our cooperation in the future.”

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Vessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

19 days ago

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

24 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

19 days ago
South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

24 days ago