offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›R&D›Giant Haliade-X 12MW Blade Comes Together
R&D

April 18, 2019 · about 7 years ago

Giant Haliade-X 12MW Blade Comes Together

LM Wind Power has produced the first blade for GE’s Haliade-X 12MW offshore wind turbine at its factory in Cherbourg, France. According to LM Wind Power, the 107m long blade, the world’s largest, has completed the molding process. The LM 107.0 P will now proceed with post-molding finishing touches,

1 minutes read
  • LinkedIn
  • X
  • Email

LM Wind Power has produced the first blade for GE’s Haliade-X 12MW offshore wind turbine at its factory in Cherbourg, France.

According to LM Wind Power, the 107m long blade, the world’s largest, has completed the molding process.

The LM 107.0 P will now proceed with post-molding finishing touches, before undergoing testing and validation to demonstrate its ability to withstand more than 20 years of operation offshore.

“The LM 107.0 P is one of the biggest single-components ever built. This is an amazing achievement not only for LM Wind Power and GE Renewable Energy, but for the entire wind industry,” said Lukasz Cejrowski , LM 107.0 P Project Director at LM Win Power.

GE Renewable Energy announced in March last year that it will invest more than USD 400 million to develop and deploy Haliade-X 12MW, the world’s most powerful offshore wind turbine.

The turbine is currently being assembled at GE’s factory in Saint-Nazaire, with tower sections being produced in Seville, Spain.

It will be installed in Maasvlakte-Rotterdam this summer and will be placed onshore to facilitate access for testing. The prototype is expected to allow the collection of data during the initial period of operations which is needed to obtain the Type Certificate in 2020 and ship first commercial units in 2021.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

R&D

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

22 days ago

A photo of the Rampion offshore wind farm off Brighton, UK, in sunrise
Featured

Ten Most Read News on offshoreWIND.biz in 2025

about 7 months ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

22 days ago
A photo of the Rampion offshore wind farm off Brighton, UK, in sunrise
Featured

Ten Most Read News on offshoreWIND.biz in 2025

about 7 months ago