offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›DOC Wraps Up Trianel Borkum II Work
Wind Farm Update

April 23, 2019 · about 7 years ago

DOC Wraps Up Trianel Borkum II Work

Tractebel DOC Offshore GmbH (DOC) has completed construction supervision of the inner array cabling at the Trianel Borkum II offshore wind farm (TWB II) in the German North Sea. From mid-August 2018, DOC supported this municipal offshore wind farm project with up to 14 DOC offshore experts, from the

2 minutes read
  • LinkedIn
  • X
  • Email

Tractebel DOC Offshore GmbH (DOC) has completed construction supervision of the inner array cabling at the Trianel Borkum II offshore wind farm (TWB II) in the German North Sea.

From mid-August 2018, DOC supported this municipal offshore wind farm project with up to 14 DOC offshore experts, from the loading of the cables, the necessary preparatory work on the transformer station and on the foundation structures, the subsequent cable laying and installation, to the connection work of the cables in the foundation structures and the concrete mattress installation for weighting the inner array cables.

Communications with the project office on land and quality assurance were further components of the DOC work package.

“DOC has always provided the project with the required quality and number of representatives in a flexible manner, thus meeting our expectations in a targeted and satisfactory manner,” said the project manager responsible for cable installation at TWB II.

The cable installation work was carried out with the Seaway Aimery, the Seaway Moxie, the Olympic Ares and the EDT Jane.

“The cooperation on the construction site and with our client was without exception positive. We are proud that we could contribute our part to the Trianel wind farm Borkum II in the area of our core competencies, ” said Oliver Spalthoff , Managing Director of DOC.

The 200MW TWB II wind farm will comprise 32 Senvion 6.2M152 wind turbines installed some 40 kilometres north of the island of Borkum. The wind farm is expected to be commissioned in autumn 2019.

Trianel Windkraftwerk Borkum II GmbH & Co. KG, the developer of the project, is owned by EWE AG with a share of 37.5 percent, and a joint venture of the power utility of the city of Zurich with 24.51 percent. The Stadtwerke-Kooperation Trianel together with 17 municipal utilities from Germany hold a share of 37.99 percent.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

24 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

26 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

24 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

26 days ago