offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Jill Departs for First Offshore Wind Work
Vessels

May 21, 2019 · about 7 years ago

Jill Departs for First Offshore Wind Work

Fred. Olsen Windcarrier’s jack-up vessel Jill has departed from the Port of Frederikshavn in Denmark to begin supporting suction bucket installation tests on a project. The work, which will be carried out in cooperation with Universal Foundation, represents the vessel’s first offshore wind assignmen

1 minutes read
  • LinkedIn
  • X
  • Email

Fred. Olsen Windcarrier’s jack-up vessel Jill has departed from the Port of Frederikshavn in Denmark to begin supporting suction bucket installation tests on a project.

The work, which will be carried out in cooperation with Universal Foundation, represents the vessel’s first offshore wind assignment.

According to Fred-Olsen Windcarrier, the aim of the project is to decrease offshore wind foundation construction and installation costs in support of the levelized cost of energy reduction.

The Danish company recently signed a long-term time charter with Falcon Global for Jill, after which the vessel began its cross-Atlantic journey from the United States to Rotterdam, the Netherlands.

Jill is equipped with 102m long legs, a rack and pinion hydraulic jacking system, and a large cargo deck. It was built to accommodate 132 persons in addition to the crew but this will be limited to a total of 80 persons in Europe.

The jack-up is capable of transporting turbine components of up to 5MW and can carry major components such as gearboxes, generators, transformers, blades and full drive trains for O&M jobs.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Vessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

19 days ago

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

24 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

19 days ago
South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

24 days ago